Font size
Background and font color
Images
Text scoring
Regular version of the site
A ready-made solution for creating a
corporate site
+7 000 000-00-00
+7 000 000-00-00 Sales department
+7 000 000-00-01 Accounting department
+7 000 000-00-02 Director
Email
chel.no-reply@allcorp3-demo.ru
The address
Chelyabinsk, Lermontova st. 21, 3rd floor, office 4
Chelyabinsk
en
ru
en
0
Chelyabinsk
Chelyabinsk, Lermontova st. 21, 3rd floor, office 4
...
+7 000 000-00-00
+7 000 000-00-00 Sales department
+7 000 000-00-01 Accounting department
+7 000 000-00-02 Director
Email
chel.no-reply@allcorp3-demo.ru
The address
Chelyabinsk, Lermontova st. 21, 3rd floor, office 4
en
ru
en
Sign in
0 Cart
Company
  • Company
  • History
  • Licenses
  • Partners
  • Brands
  • Staff
  • Reviews
  • Vacancy
  • Requisites
  • Documents
Catalog
Annual report and key financial indicators of the company
Annual report and key financial indicators of the company
  • Rent of special equipment
    Rent of special equipment
    • Dump trucks
    • Excavators
    • Manipulators
    • Truck cranes      
      • Truck cranes 14 tons
      • Truck cranes 80 tons
    • More
  • Building materials
    Building materials
    • Lawns
    • Shingles
    • Stoves, fireplaces, chimneys
    • WPC products
    • More
  • Medical equipment
    Medical equipment
    • Cosmetology
    • Laboratory
    • Medical furniture
    • X-ray machines
    • More
  • Rolled metal
    Rolled metal
    • Sections of stainless steel
    • Stainless pipes
    • Welding consumables
    • Expanded metal sheets
    • More
  • Security systems
    Security systems
    • Access control
    • Video monitoring
    • More
  • Software products
    Software products
    • CRM systems
    • Hosting
    • 1C products
    • Operating Systems
    • More
  • Ventilation systems
    Ventilation systems
    • Air ducts
    • Components
    • More
  • Designer furniture
    Designer furniture
    • Bedroom furniture
    • Beds
    • Living room furniture
    • More
Services
  • Automation
    Automation
    • Complex automation
    • POS systems
    • Sales department automation
    • More
  • Designing
    Designing
    • Electrical engineering
    • Interior design
    • Network engineering
    • More
  • Engineering systems
    Engineering systems
    • Electric lighting systems
    • Security systems
    • Ventilation
    • Video monitoring
    • More
  • Facade finishing
    Facade finishing
    • Creating a wet facade
    • Facing with a block house
    • Siding installation
    • More
  • Metal structures
    Metal structures
    • Installation of metal structures
    • Metalworking
    • Welding works
    • More
  • Rent of special equipment
    Rent of special equipment
    • Dump trucks
    • Excavators
    • Manipulators
    • Truck cranes
    • More
Projects
  • Automation
  • Building
  • Electric lighting
  • Security systems
  • Ventilation systems
Tariffs
  • Shared hosting
    • Classic hosting
      • Reddock vHost-S
      • Reddock vHost-1
      • Reddock vHost-2
      • Reddock vHost-3
    • Hosting for 1C-Bitrix
      • Reddock Bitrix-S
      • Reddock Bitrix-1
      • Reddock Bitrix-2
      • Reddock Bitrix-3
  • Virtual private server (VPS)
    • Classic VPS
      • DemoHost VPS-S
      • DemoHost VPS-1
      • DemoHost VPS-2
      • DemoHost VPS-3
    • DEMO.Site virtual server
      • DemoHost DEMO.Site-S
      • DemoHost DEMO.Site-1
      • DemoHost DEMO.Site-2
      • DemoHost DEMO.Site-3
  • Bitrix24
    • Start+
    • CRM+
    • Tasks+
    • Company
  • Flowlu
    • Elementary
    • Standard
    • Pro
    • Expert
Sales
News
Articles
Gallery
Price
  • Concrete goods, brick
  • Waterproofing and insulation
  • Soils, nets
Information
  • Faq
  • Landings
  • More
    • Typograpy
    • Buttons
    • Icons
    • Elements
Contacts
    en
    ru
    Chelyabinsk
    +7 000 000-00-00 Sales department
    +7 000 000-00-01 Accounting department
    +7 000 000-00-02 Director
    Email
    chel.no-reply@allcorp3-demo.ru
    The address
    Chelyabinsk, Lermontova st. 21, 3rd floor, office 4
    0
    Telephones
    +7 000 000-00-00 Sales department
    +7 000 000-00-01 Accounting department
    +7 000 000-00-02 Director
    Email
    chel.no-reply@allcorp3-demo.ru
    The address
    Chelyabinsk, Lermontova st. 21, 3rd floor, office 4
    0
    • en
      • Language
      • en
      • ru
    • Chelyabinsk
      • Cities
      • Chelyabinsk
      • Ekaterinburg
      • Magnitogorsk
      • Moscow
    • Cabinet
    • 0 Cart
    • +7 000 000-00-00 Sales department
      • Telephones
      • +7 000 000-00-00 Sales department
      • +7 000 000-00-01 Accounting department
      • +7 000 000-00-02 Director
    • Chelyabinsk, Lermontova st. 21, 3rd floor, office 4
    • chel.no-reply@allcorp3-demo.ru

    Ventilation system for the SEC "Solnyshko"

    Home
    —
    Projects
    —
    Ventilation systems
    —Ventilation system for the SEC "Solnyshko"
    Ventilation system for the SEC "Solnyshko"
    12/08/2019
    Čēó÷čėč ļėąķ ēäąķč’, šąēšąįīņąėč č āķåäščėč ńčńņåģó āåķņčė’öčč ā ņīšćīāī-šąēāėåźąņåėüķūé öåķņš ā źšąņ÷ąéųčå ńšīźč
    Field of activity
    Ventilation systems
    Website
    aspro.ru
    Order project
    Ask a Question
    • Description
    • Documents
    • Questions and answers
    • Additionally

    SEC "Solnyshko" was built on August 25, 2017. The structure assumes high traffic during rush hour and average traffic during the rest of the working time. Due to the unusual shape of the mall, a specially shaped duct system was required to provide aeration throughout the building without stagnation.


    Stages of work

    1. Analysis of the premises. Allcorp3 engineers spent 3 days studying the construction plans and the building itself to find areas where there is almost no air circulation.
    2. Project development. For the next 7 days, our specialists drew up drawings of the future ventilation system and coordinated it with the head.
    3. Preparatory work. The building already had a basic duct network, but it would not have been enough for half the room. Therefore, we marked out the places for new air ducts, ventilation grilles and air conditioners.
    4. It took our employees 3 weeks to create a new ventilation system. The length of the network was 1,230 meters. Now, even in case of an emergency (fire, gas pollution), the system will supply up to 3,000 people with fresh air.
    5. System testing and project completion. For 10 days, Allcorp3 engineers checked the ventilation performance. No malfunctions were identified, so the next inspection of the system was scheduled in a month. The project was completed 2 weeks ahead of schedule.

    Result

    Economical ventilation system for shopping and entertainment center with temperature control and emergency air circulation. The system is resistant to heavy loads, and high-quality materials increase the service life. The location of the system is invisible to visitors and will not cause inconvenience to service personnel.

    Documents
    d185f150e44073023ad6b1f80c2ee703
    14 byte
    bb7a3a18de6f4c048a5546363f1480b7
    15,4 KB
    c20318bf022dc52bfde89c82f39e8aa9
    18 byte
    Questions and answers
    How qualified are your specialists?
    Our employees have been trained in specialized service centers and have more than 3 years of experience at the largest enterprises in the country.
    The company regularly conducts refresher courses and special trainings to train employees in new technologies.
    Learn more
    Are you liable after the installation of your equipment?
    If the breakdown of our equipment leads to damage to your property, then we will indemnify for the damage in full. But you don't need to worry - in 11 years we have never had to use this rule.
    Catalog

    An additional tab for posting information about projects, delivery or any other important content. It will help you answer the buyer's questions and dispel his doubts about the purchase. Use it as you see fit.

    You can remove it or return it back by changing one checkbox in the component settings. Very comfortably.

    Similat projects
    Ventilation systems
    Air purification system for the confectionery factory "Slada"
    In any industrial enterprise, when processing any product, a large volume of foreign particles is emitted into the air. They settle in the lungs of employees and lead to respiratory illness. The air purification system is designed to solve this problem throughout the entire work shift.
    Staffs
    Project Manager
    Anatoly Tristanov
    Write a message
    Phone number
    +7 (000) 000-00-00
    E-mail
    manager@site.ru

    Specialist in the field of design activities. Completed 223 projects.

    Partners
    Flowlu
    Back to the list
    Subscribe to
    news and sales
    Company
    Company
    History
    Licenses
    Partners
    Brands
    Staff
    Reviews
    Vacancy
    Requisites
    Documents
    Catalog
    Rent of special equipment
    Building materials
    Medical equipment
    Rolled metal
    Security systems
    Software products
    Ventilation systems
    Designer furniture
    Services
    Automation
    Designing
    Engineering systems
    Facade finishing
    Metal structures
    Rent of special equipment
    More
    Typograpy
    Buttons
    Icons
    Elements
    Landings
    +7 000 000-00-00
    +7 000 000-00-00 Sales department
    +7 000 000-00-01 Accounting department
    +7 000 000-00-02 Director
    Email
    chel.no-reply@allcorp3-demo.ru
    The address
    Chelyabinsk, Lermontova st. 21, 3rd floor, office 4
    chel.no-reply@allcorp3-demo.ru
    Chelyabinsk, Lermontova st. 21, 3rd floor, office 4
    © 2025 Aspro: Corporate Website 3.0
    Privacy Policy
    en
    ru
    en
    Developed by
    0 Cart
    Your cart is empty
    It is easy to fix it: select the product you are interested in in the catalog and click the "Add to cart" button
    To catalog
    Homepage Personal area 0 Cart Catalog Sales Contacts Servises Brands News Employees Reviews Partners Career FAQ Company Projects Licenses Documents Requisites Blog Landings Rates Gallery Price
    Configurations
    Install ready-made themes or choose configurations. They will help you get your site up and running quickly. Everything is thought out - the structure, the location of the banners, the view of the list, the display of the product card and the text.
    Settings
    Manage settings from the public area. Choose the appearance of elements and sections, enable, disable and move blocks. Change the site design in 1 click.